Client Interaction Timeline 

Client Name: Cherice Walker

Timeline Period: [08/18/2023] - [End Date] 

Address: 5971 Enright Ave. St. Louis MO 63112  

  • Description text goes here
  • 09/06/2023

    LVM for client letting them know that we are prepared to send contractors out and would like to discuss details so encouraged her to call us back ASAP. Also, send client an email with the same info

    Completed By: AL

    09/06/2023

    Was able to talk with client Cherice Walker and she confirmed that she wanted to get her foundation sealed before she got her windows installed because she is worried about the foundation settling and shifting the windows. She informed me that she already has a bid for window repair but is having trouble finding someone to work on the foundation and would like our assistance. She let me know that Thursdays tend to be her best day to schedule. She also informed me that she is comfortable speaking directly with contractors if needed. I informed her that we would start reaching out to contractors ASAP.

    Completed By: AL

    09/18/2023

    LVM for client Cherice Walker letting her know that we wanted to give an update and touch base. Encouraged the client to call us back as soon as possible.

    Completed By: AL

    09/27/2023

    I talked with the client and let her know that we are currently reaching out to three concrete contractors, so she has ample bids to compare. She let me know that she would like to get the repairs done before the end of the year and I let her know that we would try our best.

    Completed By: AL

    09/29/2023

    LVM for client letting them know that we were reaching out to see if any of the contractors have reached out to them as of yet. Encouraged the client to call back at their earliest convenience

    Completed By: AL

  • 10/11/2023

    Talked with client Cherice Walker and asked if any contractors reached out to her in regard to foundation stabilizing. The client informed me that she had a contractor come out and they let her know that her foundation does not need any work so now she would like to get tuckpointing done instead. I informed the client that we would reach out to three tuckpointing contractors so she would be able to compare. The client then let me know that since she does not need any foundation work done she is comfortable getting her windows done now. The client let me know she should have the bid from the window by the end of the week. I asked the client to send the bid as soon as she receives it.

    Completed By: AL

    10/18/2023

    LVM for client Cherice Walker letting her know that we wanted to give an update and touch base. Encouraged the client to call us back as soon as possible.

    Completed By: AL

  • 11/17/2023

    Spoke with the client and she has already gotten some work done while in communication with Brian, but she is currently working on getting the bid from her chosen window contractor to get her second repair started.

    Completed By: AL

  • 12/01/2023

    Spoke with the client and confirmed that she has not yet sent the bid from the window contractor because her sister has them and let her know that she could contact us if she had any additional questions, comments, or concerns. Completed By: AL

    12/06/2023

    LVM for client Cherice Walker letting her know that we wanted to give an update and touch base. Encouraged the client to call us back as soon as possible. We are currently waiting on bids from contractors.,

    Completed By: BJ